Showing posts with label ALASA. Show all posts
Showing posts with label ALASA. Show all posts

Tuesday, December 01, 2015

DARPA Cancels ALASA Responsive Micro Sat Launcher

The U.S. Defense Advanced Research Projects Agency has scrapped plans to launch small satellites from a modified F-15 fighter jet after two tests of a new rocket fuel ended in explosions this year.

Instead DARPA will spend the next year studying how to harness the volatile nitrous oxide-acetylene propellant and, in parallel, modifications to existing small rockets that would enable the agency place small satellites on orbit on 24 hours notice at a cost of less than $1 million.

In March 2014, Boeing Defense Space and Security of Huntington Beach, California, won a contract potentially worth $104 million to build and demonstrate the Airborne Launch Assist Space Access (ALASA) system. The program was intended to demonstrate the capability to launch up to 45 kilograms of payload into low Earth orbit on short notice for as little as $1 million.

ALASA is one of a number of DARPA efforts to reduce the cost and turnaround time for launching national security satellites.

Boeing’s design featured a small expendable rocket launching from underneath a modified combat aircraft that would take off from a standard airport runway. Such a system would allow the Defense Department to launch from almost anywhere, DARPA said.

“The magic” in Boeing’s design, as DARPA officials described it, was the powerful nitrous oxide-acetylene propellant, also known as NA-7. The propellant would be “pre-mixed” to reduce the plumbing needed on the rocket, enabling it to carry more payload.


Monday, March 24, 2014

DARPA's Budget for its Space Programs

DARPA’s proposed budget for FY 2015 calls for a significant increase in its Experimental Spaceplane One (XS-1) program and smaller boosts in the Airborne Launch Assist Space Access (ALASA) program and Project Phoenix, budget documents show.

The defense agency has requested $27 million for re-useable XS-1 space plane this year, a significant boost over the $10 million being spent for FY 2014. With the increase in funding, DARPA plans to conduct a preliminary design review (PDR) and select a single vendor for final design, fabrication and flight test in the coming fiscal year, which will start on Oct. 1.

The XS-1 program is designed to launch payloads weighing 3,000-5,000 lbs (1,361-2,268 kg) to low earth orbit at a cost at least 10 times less expensive to current launch vehicles. DARPA accepted proposals from potential vendors earlier this year and is currently evaluating them.