Russia’s Interfax is quoted to have said that India is keen to buy four Tu-22M3 strategic bombers from Moscow.
link.
Russia’s Interfax is quoted to have said that India is keen to buy four Tu-22M3 strategic bombers from Moscow.
If you have watched cable news television in the last several months, you have probably seen a Make in India (MII) ad or two. To be sure, the US-Indian relationship is not only that of buyer-seller, it’s about prospective partnership in the defense sector: The US envisions India as a long-term, geostrategic and security partner. How India perceives this relationship going forward with respect to Russia and China will be telling.
Furthermore, there are high expectations for India’s role in Afghanistan, which have been improved by its willingness to re-engage dialogue with Pakistan at the Heart of Asia Conference earlier last week in Islamabad.
Indian Defence Minister Manohar Parrikar and US Secretary of Defense Ash Carter recently reconnoitered in Washington, and their latest official meeting signals that the US is indeed paying more attention to Asia. Whether or not the US is cultivating a new "special relationship" remains to be seen; however, it is worth noting that India is the only country for whom US authorities have established a special cell within the Pentagon to handle defense collaboration.
The India Rapid Reaction Cell (IRRC) falls under the purview of the International Cooperation Office of the Under Secretary of Defense for Acquisition, Technology and Logistics. The significance of this initiative should not be understated.
The United States ambassador to India said the two nations increasingly have a common vision of security across the Indo-Pacific region that is translating into “our forces and systems … becoming interoperable” for an array of missions.
Ambassador Richard Verma, speaking Friday at The Brookings Institution, a Washington, D.C., think tank, said this is particularly true in the maritime domain. In the past week, Indian Defense Minister Manohar Parrikar meet with Adm. Harry Harris, Pacific Command commander in Hawaii, and then flew on an MV-22 Osprey with Defense Secretary Ashton Carter to carrier USS Dwight D. Eisenhower (CVN-69) to see first-hand carrier strike group operations as part of their two-day discussion “of deepening security relations.” Carter earlier in the year became the first American Defense secretary to tour an Indian operational command.
Verma added that 2015 marked the beginning of the nations’ Defense trade technology initiative (DTTI) to “further integrate our defense industries” most notably in aviation and aircraft carrier development. In the last year, the ambassador said bilateral defense trade amounted to $14 billion, including a $3 billion contract with Boeing to deliver AH-64 Apache attack helicopters and CH-47 Chinook heavy lift helicopters to India. In turn, India will manufacture some parts for the Apaches.
Looking ahead into early 2016, he cited India’s planned involvement in the next Rim of the Pacific exercise, the United States participation in India’s Fleet review in February and both participating in a regional special operations forces (SOF) exercise in January.
In a blast of rotor wash from a Marine MV-22 Osprey, Secretary of Defense Ash Carter and Indian Minister of Defense Manohar Parrikar came aboard one of the largest and most technical expressions of American power projection — a Nimitz-class aircraft carrier.
Parrikar’s delegation of civilian officials and flag and general officers from all branches of the Indian military nibbled on treats from Ike’s galley before watching F/A-18s catapult from the flight deck and quizzing the ship’s crew on the day-to-day realities of carrier operations.
The trip — while a textbook execution of the Navy’s age-old distinguished visitor carrier visit program — took on extra significance as the U.S. and India continue to outline how the two countries could cooperate in constructing India’s second domestically built aircraft carrier and deepen bilateral operations.
Before departing the Pentagon on Thursday, Carter and Parrikar held a joint press conference to serve as an update on how defense cooperation between two countries is progressing since the early 2015 India and U.S. Defense Technology and Trade Initiative agreement.
The Indian Air Force and Navy plan to re-enact an exercise performed off the northern coast of Gujarat nearly 40 years ago in the next few days. It will not only test the country's defences in the western front but also be an attempt to display India's strengths in the air and sea. Nearly 50 years ago, in September, 1965, the Pakistan Navy bombarded Dwarka in an attempt to shift focus from the raging air war that was taking a heavy toll on its aircraft. On that day, no Indian Navy ship was in a position to respond. Though there was no damage to the Somnath Temple or a radar station at Dwarka, Pakistan continues to gloat over 'Op Dwarka'.
India's largest-ever military deal is likely to bring in big business for the private sector with the French side looking to set up a production centre for the Rafale fighter aircraft as well as a low-cost executive jet in India, besides sharing vital aircraft technology for the indigenous Tejas project.
Indian Air Force on Saturday said it would need at least six squadrons comprising 108 Rafale or similar jets to shore up its capabilities as it hoped that the contract for 36 French fighter aircraft would be inked by year-end.
Noting that two squadron of 18 Rafale jets each might not be enough, Air Force chief Air Chief Marshal Arup Raha said his force would like to have at least six squadrons of the medium multi-role combat aircraft (MMRCA).
He hinted that even though the Rafale is the front- runner, India may go in for another aircraft with similar capabilities "if the deal is good".
"Definitely, we would like to have MMRCA variety of aircraft. At least about six squadrons to my mind. Let us see, there may be some other alternatives as well," Raha said addressing a press conference ahead of the Air Force Day on October 8.
He was replying to questions about the possibility of India Air Force wanting more than the 36 Rafales under a government to government deal announced by Prime Minister Narendra Modi during his trip to France in April.
Asked if the additional four squadrons of aircraft will be Rafales or if there is a possibility of other players getting into play, Raha said, "I may wish to have Rafale. But there are equally good aircraft. So if the deal is good and the government decides we need to have six of similar squadron."
"There are alternatives. I cannot say I only want Rafale. I want capability of Rafale type aircraft. So the government will have a look at it and based on urgency and the type of contract is signed with Dassault Aviation, further decisions may be taken by the government. I cannot predict," he said.
The Indian government recently approved a plan to procure ten new missile-armed drones from Israel. “The $400-million proposal for buying armed Heron TP drones from Israel was cleared last week,” The Economic Times reported.
These new drones will be operated by the Indian Air Force (IAF), which already has a large fleet of Searcher and Heron I reconnaissance drones. Both are produced by Israel Aircraft Industries (IAI). The IAF also has a fleet of Harpy UAVs from Israel – designed as loitering radar-supression weapons. In addition,India operates the HAROP, a spin-off variant of the loitering weapon, designed to attack other surface targets. (Both Harpy and Harop are also made by IAI).
India's purchase of French Rafale fighter jets could be concluded in about 10 days, a source with knowledge of talks on the deal told Reuters on Friday.
Indian Prime Minister Narendra Modi said in April he had ordered 36 Rafale fighters to modernize his country's warplane fleet, though detailed terms and conditions remained to be settled.
Modi had opted to deal directly with the French government after three years of inconclusive negotiations with the plane's manufacturer, Dassault.
"Things are getting better with India," the source said. "An agreement could be seen in about 10 days."
The Hindustan Aeronautics Ltd (HAL) may use its Ozar facility to manufacture fifth generation fighter aircraft, for which it is already in talks with Russia for co-design and production.
T Suvarna Raju, chairman and managing director, HAL said, "We are co-developing the fifth generation fighter aircraft (FGFAs). We have completed the first phase and are in talks with Russia for detailed design and manufacturing of the aircraft. We are planning to manufacture the FGFA at our Ozar facility.
India's criticism of a high price tag on the Dassault Rafale has sharpened public focus on French negotiations to extend sale of the twin-jet fighter beyond a planned 36 units for the Indian Air Force.
Indian Defence Minister Manohar Parrikar fueled speculation about the final size of the Rafale order May 31 when he said the French fighters were "way too expensive" and there was no longer a plan to buy a total of 126 Rafales.
But Dassault Aviation Chairman Eric Trappier said the 126-jet deal "is under discussion," although he admitted progress is slow.
"The Indian Air Force needs many more than 36 planes," Trappier told Defense News.
"There is an immediate need for 36. The negotiations for 126 are rather slow.
"They have an urgent operational requirement which does not allow time needed to set up the license, so they asked for 36 quickly," said the Dassault boss.
India has been negotiating to buy 126 Rafales under the Medium Multirole Combat Aircraft (MMRCA) program after beating the Eurofighter Typhoon to selection in 2012.
The future of that deal was clouded after the unexpected announcement by Indian Prime Minister Narendra Modi during a visit to Paris April 10 that India wanted 36 jets straight off the Dassault production line.
Modi cited "critical operational necessity" to buy the Rafales in fly-away condition.
Trappier said he hopes that particular deal will be signed by the end of the year.
The Indian defense minister's remark on the high price was understandable, a French defense specialist said.
Beyond the fly-away unit price, there is the "real price" that includes support and equipment such as a test bench, maintenance tools, manuals and training simulators. The technical support runs in hundreds of millions of euros and is a separate cost from the supply of spares and the aircraft.
Negotiations for the 36 units may have unveiled the full potential cost, after Modi's announcement of the planned purchase.
The purchase of the F-35 should give the Japan Air Self-Defense Force (JASDF) next-generation intelligence, surveillance and reconnaissance performance, but upgrades to Japan's F-2 and F-15 fleets can continue for only so long, and replacements will be needed in the mid-to-late 2020s, analysts say.
In one of the most critical stages shaping its indigenous fighter jet program, the Turkish government plans to select a foreign partner by 2016, officials said.
The foreign partner would be expected to support the approximately four-year planned designing phase of the program dubbed F-X, the officials said.
One senior procurement official said the contract involving the foreign partner would be around US $1 billion.
India's Comptroller and Auditor General (CAG) declared on 8 May that the locally designed Tejas Light Combat Aircraft (LCA) Mk I was "operationally deficient" and its pilots vulnerable even to 7.62 mm rounds fired at the fighter's front end.
In the 63-page report tabled in parliament, Shashi Kant Sharma revealed that the long-delayed LCA Mk I, which obtained its second initial operational clearance (IOC-2) in December 2013, had failed to meet the Indian Air Force's (IAF's) air staff requirements on numerous counts.
It disclosed that to secure IOC-2, the LCA Mk I - under development by the state-run Aeronautical Development Agency (ADA) since 1983 - had to be granted 53 waivers, of which 20 were permanent.
The latter would remain, the CAG said, even after the platform secured its final operational clearance (FOC) scheduled for December 2015. IAF sources said FOC was likely to be deferred.
The LCA Mk I obtained its first IOC from the Centre for Military Airworthiness and Certification in Bangalore in January 2011, only for it to be re-confirmed in 2013 by the definitive IOC-2.
The persistent shortcomings, some of which were still under design, development, and testing, include excessive weight, engine thrust, reduced internal fuel capacity, non-compliance of all-weather operations, non-achievement of single-point defueling fuel system protection, and pilot protection. They restrict the "operational efficiency and survivability of the aircraft, thereby limiting its employability when inducted into IAF squadrons", the report said.
It is also "deficient in electronic warfare (EW) capabilities as specified by the IAF, as the self-protection jammer could not be fitted on the aircraft due to space constraints", the report stated.
US defence secretary Ashton Carter's two-day visit to India in early June is expected to raise the levels of bilateral strategic and defence co-operation between the two countries, senior Indian military officials have told IHS Jane's .
Carter will sign a 10-year India-US Defence Framework Agreement and fast-track the Defence Trade and Technology Initiative (DTTI), under which the two countries will co-develop and co-produce military equipment in India.
Industry sources said that under the DTTI, which Carter initiated as deputy defence secretary in 2012, the US was expected to offer the Textron AirLand Scorpion light-attack and intelligence, surveillance, and reconnaissance (ISR) aircraft currently being developed to the Indian Air Force (IAF).
Air Chief Marshal Arup Raha, who is believed to have expressed interest in the Scorpion, believes the twin-seat platform can double as an intermediate jet trainer (IJT). The IAF badly needs an IJT due to delays to the Sitara (Star) platform, which Hindustan Aeronautics Limited (HAL) has been developing since 2005.
At the 2014 Farnborough Airshow, Textron officials told IHS Jane's that the Scorpion would cost less than USD20 million to procure and around USD3,000 per hour to operate. The company has also outlined a sales target of 2,000 platforms to international operators over the coming years. It did not respond to requests for comment on the potential deal with India.
India and France aim to finalise the deal for 36 Dassault Rafale fighters for the Indian Air Force (IAF) by the end of May, according to defence industry sources.
Indian prime minister Narendra Modi is believed to have insisted on this deadline with his French counterpart Francois Hollande in Paris, soon after announcing the fighters' procurement on 10 April.
Once inked, the IAF will be the first customer, after the French Air Force, to acquire Rafales. Egypt has also agreed to buy 24 Rafales.
Meanwhile, a delegation comprising senior French government officials and top Dassault executives is expected in New Delhi over the next few days to begin negotiating the fighter contract, which is estimated at around USD5-6 billion. French defence minister Jean-Yves Le Drian is likely to be part of this delegation, but no confirmation of his inclusion was possible.
Industry sources familiar with the ongoing talks between the two governments told IHS Jane's that Dassault is reported to have agreed to more than double its annual Rafale building capacity from 11 to 24 aircraft. The company had slowed down Rafale production rate to around 11 platforms per year as no new orders were forthcoming.
The French government is also believed to have persuaded its air force to reduce its Rafale induction until the IAF contract is fulfilled.
Indian defence minister Manohar Parrikar told the Mail Today newspaper on 16 April that the accounting process for the Rafales would be completed within 2-3 months and deliveries would begin in 18 months. "So roughly it [the contract] will take three years," he said.
Any future Indian purchase of Rafale jets will come through direct talks with the French government, the defence minister said on Monday, effectively killing commercial negotiations for a larger deal with Dassault Aviation.
India's Prime Minister Narendra Modi on Friday announced a plan to buy 36 planes from Dassault through the government-to-government route, after three years of price negotiations for local assembly of the aircraft produced no results.
Defence Minister Manohar Parrikar said Modi's decision came after commercial negotiations went into a "vortex". He stopped short, though, of saying the government had scrapped talks on a contract with Dassault for 126 planes worth up to $20 billion.
"This had to be done to break the vortex," he said, adding that the preferred method was now to talk directly to the French government, rather than return to commercial negotiations.
"Instead of going through the RFP (Request For Proposal bidding process), where there is lot of confusion, chaos, it is now the situation that 36 will be procured ready to fly. What is to be done with the rest will have to be discussed," Parrikar said.
A decision to abandon commercial talks would end what had been touted as one of the world's biggest defence deals and could give hope to rival manufacturers, experts said.
Indian Prime Minister Narendra Modi said on Friday he had asked France to supply his air force with 36 Rafale fighter jets, after years of wrangling over the deal.
"I asked the President (Francois Hollande) to supply us with 36 Rafale jet fighter planes, the ready-to-fly models," Modi said at a joint news conference at the Elysee Palace.
"France has always been a reliable supplier for India from jet fighters to submarines," said Modi.
The programme for India and Russia to jointly develop a Fifth Generation Fighter Aircraft (FGFA), long touted as the flagship of a time-tested defence relationship, has run into a stone wall.
Documents available with Business Standard indicate India's defence ministry is cold-shouldering Russian requests to continue the negotiations on a "R&D Draft Contract", which will govern the partnership to develop a futuristic, fifth-generation fighter.
A letter from Russia's powerful export agency, Roso-boronexport, points India's defence ministry has not responded to Russian requests dated February 9 and March 3, which "suggested holding of the negotiations in February and March of 2015."
"(W)e have not received any data regarding readiness of the Indian side for the negotiations," the letter says. It goes on to request holding the next round of negotiations between April 6 and 9.
The letter refers to Project 79L, the code name for the FGFA project.
This is a precipitous fall from grace for a co-development project considered so strategic that an Inter Governmental Agreement (IGA) that New Delhi and Moscow signed in October 2007 exempts it from normal procurement rules. Indian defence planners have long held that co-developing the FGFA would help India build its own fifth-generation Advanced Medium Combat Aircraft (AMCA).
Following the IGA came a General Contract in December 2008, which stipulated details like work share and cost, and the conditions under which the FGFA could be sold to other countries. Under a Preliminary Design Contract (PDC) in December 2010, New Delhi and Moscow contributed $295 million each to finalise the fighter's basic configuration, systems and equipment.
With that completed in June 2013, the R&D Contract is now being negotiated. This would govern the actual design and development of the FGFA, and is estimated to cost $3-4 billion each. Meanwhile, the Indian Air Force (IAF) has turned cold to the FGFA proposal. Sources tell Business Standard this is because air marshals fear the FGFA undermines the rationale for buying the Rafale fighter from France, a $18-20 billion contract that is sputtering through so-far unsuccessful negotiations.
The first sign of the air force's eventual volte-face on the FGFA came in October 2012, when then IAF boss, Air Chief Marshal NAK Browne, announced the IAF would buy only 144 FGFAs instead of the 214 that were originally planned.
In December 24, 2013, top IAF officials alleged the FGFA would not meet Indian expectations. Business Standard reported that air marshals at a high-level defence ministry meeting (January 21, 2014, "Russia can't deliver on Fifth Generation Fighter Aircraft: IAF") claimed the FGFA has "shortfalls… in terms of performance and other technical features."
The IAF claimed the FGFA's current AL-41F1 engines were underpowered; the Russians were reluctant to share critical design information; and the fighter would eventually cost too much.
On January 15, 2014, at a MoD meeting to review progress on the FGFA, the deputy chief of air staff (DCAS), the IAF's top procurement official, said the FGFA's engine was unreliable, its radar inadequate, its stealth features badly engineered, India's work share too low, and the fighter's price would be exorbitant by the time it enters service.
India's Ministry of Defence (MoD) has reportedly become so frustrated with the impasse in negotiations with Dassault over the contract for the Rafale fighter aircraft that it has decided to accelerate the timetable for the localised production of Russia's PAK-FA/T-50 fifth-generation fighter.
The contract for this programme, in which India has a subsidiary role in the development of a version of the aircraft tailored to their requirements, is in the final stages of negotiation.
While New Delhi negotiates for a small share of Sukhoi T-50 development, its defense ministry engineers prepare a fighter that would be 80% Indian.The designers have now frozen the configuration of a proposed medium-weight Indian fighter that they expect to fly early in the 2020s. General Electric is the preferred supplier of propulsion for the twin-engine, stealthy Advanced Medium Combat Aircraft (AMCA).
India and Russia agreed on 21 January to expedite their joint military programmes, particularly the delayed Fifth Generation Fighter Aircraft (FGFA) project.
"We discussed all issues, including the FGFA, and have decided to fast-track many of them as there are apprehensions about the slow pace in their execution," Indian defence minister Manohar Parrikar said in New Delhi.
Speaking after jointly chairing the Inter-Governmental Commission on Military Technical Cooperation (IGC-MTC) with his Russian counterpart Sergei Shoigu, Parrikar said the two sides would hold regular "interactions" to maintain project deadlines.
Official sources told IHS Jane's that differences persisted on the FGFA's preliminary design features despite a 10 January Russian media report claiming that the two sides had managed to resolve them following a four-year delay.
Quoting FGFA project director Andrev Marshankin, the Sputnik news agency had reported agreement between Indian and Russian officials on the specifications of the 30-tonne fighter, which is based on the Sukhoi T-50 PAK-FA. Enduring Indian reservations over the FGFA programme include those over the fighter's AL-41F1 engine and its stealth and weapon-carrying capability.
India is also insistent on Russia restoring its workload in the USD10.5 billion developmental programme after recently reducing it from 25% to 13% without consulting Delhi. It is also seeking greater access to the fighter's design configuration, which it claims it is denied.
The Indian Air Force (IAF) plans on acquiring around 130 FGFA, down from an earlier projected requirement of around 220.
Russia and India have completed the preliminary design for the Sukhoi/HAL Fifth Generation Fighter Aircraft (FGFA), the regional director of international cooperation at the united Russian-Indian aircraft manufacturing company said Saturday.
“As of now, we and our Indian colleagues have completed the creation of the export version of the [Sukhoi] PAK FA, known in India as FGFA. We already have documents and understanding of the scope of the next phase of design, the scale of future production,” Andrey Marshankin said in an interview with the Russian News Service radio.
Marshankin noted that while the Russian version of the fifth generation fighter jet is operated by a single pilot, the Indian Air Force prefers aircraft that are operated by two pilots.
India's long-delayed procurement of 126 Dassault Rafale fighter aircraft has once again run into "complications", defence minister Manohar Parrikar admitted on 30 December.
Parrikar did not specify these difficulties at a press conference in New Delhi, but tellingly stated that additional licence-built Sukhoi Su-30MKI multirole fighters would be "adequate" for the Indian Air Force (IAF) in the event of the Rafale deal being scrapped.
"The Su-30MKI is an adequate aircraft for meeting the air force's needs," Parrikar said, adding that at INR3.58 billion (USD59.66 million) each, the unit cost of the Su-30MKIs being licence-built by Hindustan Aeronautics Limited (HAL) was less than half that of a Rafale.